Türkçe
English
Philippines Puting Bato 1x135MW Coal-Fired Power Plant Project Unit-1 Passed the Boiler Hydro Test..

On Jan.12, 2014, the Philippines Puting Bato 1x135MW Coal-Fired Power Plant Project contracted by CNTIC with EP+S model succeeded in conducting the boiler hydro test on its first try. (20.01.2014)

© Genertec Turkey | 2017
ike
ike